HomeProductsEQUIPMENT ServicesProjectNewsContact
Vietnamese
EQUIPMENT LIST
System RMV
System VRV
SYSTEM CHILLER
PRODUCT CATALOGUE
DUCT FABRICATION
AIR DIFFUSER MANUFACTURING
AIR CONDITIONING
DAMPER MANUFACTURING
ELECTRIC CABLE
WATER TREATMENT
ORTHERS
PROJECT
Office Buildings Interior Ministry
Constructing glass roof for the building of Long Bien District People’s Committee
AC maintenance at Canon Factory
Lagging for Hoya II factory
Đồng Tầu 9& 10
Ruby Plaza
WEB LINKS
SEABANK
Hai Phong Securites
Đọc báo trực tuyến
News  Việt Nam
Obayashi Vietnam
Takisa
Caon Factory
Site Counter : 642412
Number Online: 11
 
 

Executing air-conditioned system of ventilation for the Military Hospital 108

    Hanotec has just executed air-conditioned system of ventilation for the Military hospital 108. This is an entirely new constructed building with modern radioactive medical equipment, which is designed and monitored by British engineers.

 With the nature of an important building, the requirements of high-tech, we always try our best to satisfy investors about the quality and speed of the work proposed.

  Email Friend   Print News
Later News
(01/ 10/ 2010)
Engineering group in E1-Yen Hoa Urban Area (25/ 09/ 2010)
KeangNam Tower (25/ 09/ 2010)
Office Buildings Interior Ministry (25/ 09/ 2010)
(16/ 02/ 2009)
Other News
Constructing glass roof for the building of Long Bien District People’s Committee (26/ 08/ 2008)
Supply and installation of air duct and diffuser systems for Song Kim Building (23/ 08/ 2008)
AC maintenance at Canon Factory (20/ 08/ 2008)
Work at Canon 07A Factory (20/ 08/ 2008)
Lagging for Hoya II factory (20/ 08/ 2008)
See More >>
Back To Top